Clean room sandwich panel wholesale factory in China

Premium clean room sandwich panel wholesale manufacturer and supplier: Suzhou Pharma has always provided the pharmaceutical industry with high standards and strict requirements for pharmaceutical clean rooms, laboratories, and pharmaceutical workshops. At the same time, we also solve pharmaceutical equipment problems for our customers. Pharmaceutical equipment usually comes into direct contact with drugs, so whether it is material, stability, quality, or production efficiency, they must meet the requirements of GMP. See even more info on gmp clean room panels.

Clean room equipment includes air purification equipment and air ventilation equipment. During the construction process, it is necessary to select the appropriate air filtration equipment according to specific practical needs. In general, the selection of air purification equipment will use coupled filtration technology to achieve the purpose of eliminating dust in the air, that is, through multiple layers of different filtration forms, to eliminate foreign particles and harmful substances in the air.

The filling speed of the capsule filling machine is fast, and the size difference of the capsule filling machine is small. It integrates the powder capsule shell finishing, capsule cap finishing and capsule package, which is compact and convenient. In addition, the capsule filling machine has many advantages, such as fast arrangement speed, high efficiency, simple operation, convenient maintenance and low power consumption. It is the preferred capsule filling (filling) machine for pharmaceutical factories, health product factories, hospital preparation rooms, etc

Use a Hygrometer: A hygrometer is a device that measures the current humidity level in the room. By regularly monitoring the cleanroom humidity control with a hygrometer, you can identify any fluctuations and take corrective action if necessary. Ventilation: Proper ventilation is crucial for maintaining healthy humidity levels in clean rooms. Ensure that there are sufficient exhaust fans in place to remove excess moisture and carbon dioxide from the air. Additionally, consider installing temperature and humidity sensors to monitor changes in the environment and adjust ventilation accordingly. Control Water Sources: Closely monitor water sources within the clean room, such as sinks or taps, as they can contribute to high humidity levels. Be sure to turn off faucets when not in use and avoid running water unnecessarily.

The laboratory with multiple combinations can adopt single channel design, double channel design, and standard unit combination design. The structure of the laboratory should have applicability, versatility and flexibility to meet the needs of the subsequent development, renovation and expansion. Experimental rooms involving radioactivity, pollution and personal harm and other special requirements, the building layout, maintenance structure, decoration should meet the corresponding professional and technical requirements. The laboratory should be cleaned and disinfected regularly; ground, wall and ceiling shall be integral waterproof and dust-proof construction. The interior should reduce the protruding building fittings and open pipes; Between the wall and wall, the wall and ground, the wall and ceiling should be made of a radius of not less than 0.05m semi-rounded corner.

The clean room workshop is also called the dust free workshop, gmp cleanroom, the industrial clean room (Clean Room) and the dust free room. It refers to the removal of pollutants such as particles, harmful air and bacteria in the air within a certain space, and the indoor temperature,cleanliness, indoor pressure, air velocity and air distribution, noise and vibration, lighting and static control. A specially designed clean room for a particular requirement. That is to say, no matter how the extemal air conditions change, the clean room can maintain the characteristics of cleanliness temperature and humidity and pressure.

The detection of air volume and wind speed must be carried out first, and all effects of purified air conditioning must be obtained under the designed air volume and wind speed. Before air volume detection, it is necessary to check whether the fan operates normally, whether all components in the system are installed correctly and whether there are obstacles (such as whether the filter is blocked or blocked). All valves should be fixed at a certain opening position, and the size of the measured air outlet and air duct must be measured. For the turbulent flow clean room, the air supply volume shall be determined by the air outlet method or air duct method. See Item 6, 7 and 8 respectively. For the air outlet without filter, the method in Appendix I of the current national standard code for construction and acceptance of ventilation and air conditioning engineering (gbj243) can be implemented.

Tablet punches and dies supplier 2024: Generally, the air flow distribution point on the surface of the operating table or production equipment should be located at 2/3 of the distance between the clean room space and the partition wall, so that when the operator is working, the air flow can flow from the inside of the process area to the operation area, and the The dust is taken away; if the distribution point is arranged in front of the process area, it will become an improper airflow distribution. At this time, most of the air flow will flow to the process area, and the dust caused by the operator’s operation will be brought to the back of the equipment. As a result, the platform will be polluted, and the yield rate is bound to decrease.

The clean room is generally made of foam color steel or rock wool board with a vertical wall and an independent air-conditioning air supply system. The air is filtered through high-efficiency three-stage filtration in junior high schools. The personnel and materials are equipped with an air shower room and a transfer window for clean filtration.

What is the purpose of the clean room test of the clean workshop? Most of the owners are based on the original vision of the purification project to complete the test indicators. Of course, this is the most straightforward goal and method. After all, our intention to build a clean room is also As such, there is a need to achieve our air cleanliness. In a single-flow type clean room, the location of the wind speed measurement can be specified by the owner, usually on the surface of the filter screen or at the working height. However, it should be noted that it is the air velocity measurement of the filter screen (the surface of the filter screen) or the indoor air velocity measurement of the clean room (working height). Clean workshop, clean room, clean room — the purpose of clean workshop and clean room test. Read extra information on https://www.sz-pharma.com/.